So we have received most of the components needed for the pre-production run (scroll down to see)! There were a few issues with some of the components not arriving in tubes or on reels, so we are working on getting them replaced in the next few days. The custom RF shields and factory programmed Si5338s will be the last components to arrive, which should hopefully happen within the next week or so. Once they arrive, the PCBs should have also arrived and allowing our contract manufacturer to give us an exact delivery date! Once we have those units in our hands we will spend a bit of time verifying and calibrating each unit, and ultimately ship them to pre-production backers in a timely manner!
Hundreds of DC barrel jacks weigh close to 7 pounds!
Discrete components on reels.
Mini-Circuits RF transformers on massive reels.
Thousands of SMA connectors weighing close to 16 pounds.
Pre-production FPGAs and FX3s arrived with specially dehumidified boxes.
Line up of everything that has arrive so far.