We received a sizable shipment of nearly 200 bladeRFs on Thursday, we’re calibrating them over the weekend. This also means that we now have enough units to fill every order! Most orders that will be filled next week are going to international backers, which take a considerable amount of time to prepare correctly. Things should move more smoothly and quickly now that we are working with order fulfillment specialists to send bladeRFs internationally.

Also, all of the GPIO boards were manufactured and delivered to us this week. The boards have all been tested and are also ready to be mailed to be mailed out as well. If you ordered a bladeRF and a GPIO expansion board, and have only received the bladeRF until now, we will now mail your GPIO expansion board.

 

box_of_gpio

 

closeup

 

Here’s a close up of the GPIO board with the very bright tri-color LED turned off.

Posted by & filed under bladeRF.

 

We shipped nearly 230 boards this past week! Surprisingly, the most time intensive part of the whole order fulfillment process, besides testing and calibrating each unit is actually boxing and shipping the units. We have received additional help so when we get the next batch of 100 units we will ship them all out within a day or two instead of taking a whole week.

If you are curios to experiment with the build environments, our Github (https://github.com/nuand/bladeRF ) now has tutorials and instructions for building all of the software and HDL parts of bladeRF. (Picture guides are coming soon!)

The Linux driver is nearly complete and stable; several important concurrency patches will be committed by the end of the weekend that will address issues some of you may have experienced. Also, we are now planning on including additional Linux support by using libusb, this will also allow us to quickly port the code to Windows and OSX. The Linux driver will still continue to exist as our default Linux support because of the incredibly low SDR latencies we can achieve with it and the bladeRF. Preliminary testing has shown that we can easily go below 10us!

Lastly, here is a picture of the last 70 units before they were shipped.

 

last_70_units

Posted by & filed under bladeRF.

 

We have received about 200 bladeRFs, and sent out about half of them. We intend to double the number of calibrated and shipped boards by the end of this week. But if everything goes according to plan and we get lucky enough, we might be able to ship as many as 300 by the end of next week.

In addition, the GPIO expansion boards will be here at the end of next week. For those of you that have ordered the GPIO boards and already received your units, we will ship you the GPIO boards separately.

If you have any questions about your bladeRF please post to our forum at http://nuand.com/forums/ . We are also available on IRC in #bladeRF on Freenode.

Here are a couple of pictures of our order fulfillment operation!

 

1_box_large

This package is the third batch from the mass production run, it contains about 80 x115 bladeRFs.

 

2_boxes

The second box (on the right) has about 60 x40 bladeRFs.

 

4_cables

Here we have several hundred USB3.0 cables.

 

 

 

5_sma

Here we have a lot more SMA cables.

 

6_final_calibration_test

At this station the bladeRF will undergo its calibration. Its VCTCXO will be calibrated against a recently calibrated Agilent Technologies 53220A frequency counter. Once the VCTCXO is calibrated, it undergoes several RF tests where it is compared and test with a known good and calibrated unit.

best_vctcxo

 

All bladeRFs are calibrated to within 10ppb but every once in a while we see an exceptionally  well calibrated unit. In this picture the 38.4MHz VCTCXO was calibrated to 38.399,999,997 MHZ long enough for us to take a picture of it. This works out to around 0.078ppb (parts per billion) or 78ppt (parts per trillion) error. In reality thought our VCTCXOs are calibrated to within 10ppb.

 

7_outbound_boxes

 

And lastly, here are a bunch of packed units ready to be picked up.

Posted by & filed under bladeRF.

 

We shipped our first units from a batch of 100 units this week! Unfortunately our assembly house is having some difficulty sticking to their original timeline; fortunately though  we’re still likely to have everything (including the site pre-orders) shipped this month.

Lastly, now that the boards are nearing completion, we will now go on to focus much more intensely on our other Kickstarter campaign goals, such as putting together examples and tutorials. We have a few basic modulation examples we’re working on putting together, but once that is done we’d like to take your suggestions for the priorities and contents of different tutorials!

Posted by & filed under bladeRF.

 

We’ve continued expanding bladeRF’s software support, so by the time you start receiving your units there should be a pretty seamless bladeRF experience! We’ve received word from our contract manufacturer that the boards will be assembled and tested between June 28th and July 1st. Once we pick up the units, we will quickly run them through a second round of calibrations, pack them up, and finally mail them out!